 Mambog Ongoing Projects

Mambog preparation

Date Started November 1,2018

Target Completion Date June 6,2019

0 Before.jpg

Before

1 Removal of old debris from the old hou

Removal of old debris from the house

2 Workers preparing the foundation of th

Workers preparing the foundation of the house

3 Prepared foundation of the house.jpg

Prepared foundation of the house

4 Rectangular steel frame has been insta

Rectangular steel frame has been installed

5 Foundation has been installed.jpg

Foundation has been installed

6 Grade beam has been completed.jpg

Grade beam has been completed

7 Foreman measuring the layout of the ho

Foreman measuring the layout of the house

8 Workers preparing the scaffolding supp

Workers preparing the scaffolding support

9 Construction of column beam support at

Construction of column beam support for the 2nd floor

10 Preparing the concrete slab at 2nd fl

Preparing the concrete slab at 2nd floor

(composite steel deck will be used)

11 Workers verifying the layout for the

Workers verifying the layout for the 2nd floor

12 Installation of composite steel deck

 Installation of composite steel deck for the 2nd floor

13 Scaffolding has been used to support

Scaffolding has been used to support the 2nd floor concrete slab

14 Preparing the wall surface at 2nd flo

Preparing the wall surface at 2nd floor

15 Finishing of wall surface at 2nd floo

Finishing of wall surface at 2nd floor

16 Preparing the concrete slab (3rd floo

Preparing the concrete slab (3rd floor)

17 Construction of concrete slab (3rd fl

Construction of concrete slab (3rd floor)

18 Construction of wall at 3rd floor are

Construction of wall surface at 3rd floor area

19 Roof frame at 3rd floor area has been

Installation of roof frame at 3rd floor

20 Installation of rectangular steel fra

Installation of rectangular steel frame at balcony area

21 Foreman checking the layout of the st

Foreman checking the layout of the stairs

22 Construction of the stairway.jpg

 Construction of the stairway

23 Workers preparing the wall at balcony

Workers preparing the wall surface at balcony area

24 Installation of ceiling frame.jpg

Installation of ceiling frame

25 Installation of wiring at 2nd floor a

Wiring installation at 2nd floor area

26 Ceiling Board has been installed.jpg

Ceiling Board has been installed

27 Engineer Ronald Bravo checking the me

Engr. Ronald Bravo checking the measurement of Stainless Steel Guard Rail

28 Preparing the stainless steel guard r

Preparing the stainless steel guard rail

29 Installation of tiles at comfort room

Installation of tiles at comfort room (2nd floor area)

30 Carpenter preparing the cabinet at be

 Carpenter preparing the cabinet at bedroom area

31 Layout for the septic tank.jpg

Prepared layout for the septic tank

32 Finalizing the covering of septic vau

Finalizing the covering of septic vault

34 frontside 3rd floor.jpg

Frontside roof deck area

33 Backside 3rd floor.jpg

Backside roof deck area

Mambog Ongoing Projects
Finishing Operation

Target Completion Date June 6,2019

0 Ground floor stairway.jpg

Completion of stairway ground floor

Mabog Finishing
0.1 Finishing of stairway.jpg

Finishing of stairway

1 balcony area.jpg

Completion of balcony area

2 Installation of windows.jpg

Completion of windows

Completion of balcony area

3.0 Panel door.jpg

Installation of panel doors at 2nd floor

3.1 panel door lock.jpg

Yale door knob and lock has been installed

4.0 Living room (side view).jpg

Living room side area

4.1 Living room (front view).jpg

Living room front area

5 Kitchen Area.jpg

Completion of kitchen area

6.0 Comfort room.jpg

Completion of comfort room

6.1 Comfort room.jpg

Installation of toilet lavatory  (Pozzi brand)

7.0 Ground floor (washing room).jpg

 Completion of ground floor washing area

7.1 Ground floor (reception area).jpg

Ground floor reception area