La Joya Bebz Completed Project
Target Completion Date October 30,2018


Before
After

Digging the foundation of the house

Prepared foundation of the house

Rectangular steel frame has been installed

Preparing the grade beam of the house

Workers preparing the wall surface for finishing.

Installation of PVC PIPES

Installation of circuit breaker

Installation of tiles

Installation of tiles at comfort room


Before (old stairs)
After (new stairs)
Renovation of stairs

Completion of kitchen area
Completion of kitchen area

Finalizing the design at bar area

Completion of bar area

Installation of panel doors
Installation of panel doors

Installation of sink

Installation of toilet lavatory

Completion of living room area (side 1)

Completion of living room area (side 2)

Completion of 1st bedroom

Completion of 2nd bedroom

Completion of master's bedroom

Master's bedroom front area