Baguio Preparation

 Baguio Completed Projects

0.0 front view (old).jpg

Before

0.1 completed rooftop.jpg

After

1 .1 flooring (old).jpg

Old flooring of the house

1.2 removal of old flooring.jpg

Removal of old flooring

1.3 removing old fence 1.jpg

Removal of old fence

1.4 chipping of post foundation 1.jpg

Preparing the new layout for the old post

1.5 waterproofing the flooring.jpg

Preparing the floor for the new layout

1.6 side view (old).jpg

Side view of the house (Old)

2 kitchen renovation 1.jpg

Preparing the kitchen (deck area)

5 tiles installation 1.jpg

Installation of tiles

4 preparing the roof layout.jpg

Workers preparing the frame for the roof

Baguio Finishing Operaton
4.1 roof frame installation.jpg

Completion of the roof

3 Comfort room Installation.jpg

Preparing the installation of toilet lavatory

6 tile installation wall surface front a

Tiles installation at front area

7 Installation of tiles has been complet

Tiles installation completion

8 finishing of walls.jpg

Fence installation completion

10 kitchen completion.jpg

Completion of kitchen at deck area

sink.jpg

Completion of sink installation

11 exhaust installation.jpg

Exhaust installation at comfort room (deck area)

9 Roofing completion.jpg

Roofing with PVC installated has been completed

11.1 lavatory has been installed 1.jpg

Completion of comfort room (deck area)

11.2 Water tank foundation has been comp

Completion of water tank foundation

12 installation of post light.jpg

Completion of light post at deck area