Construction Of Retaining Wall Preparation

Construction Of Retaining Wall

0.0 IMG20180224075356.jpg

Preparing the layout for digging

0.1IMG20180224080337.jpg

Preparing to dig the land

0.3.jpg

Land are ready for construction

0.4.jpg

Land are ready for construction (other side)

1.0 I7MG20180226133046.jpg

Preparing the foundation of the construction

1.1.jpg

Preparing the steel bar for the concrete wall

1.2 IMG20180226204234.jpg

Preparing the steel bar for the concrete wall

1.3.jpg

Concrete solution has been poured

1.4.jpg

Preparing the 2nd layer of the fence

1.5.jpg

Rectangular steel frame has been installed

1.6.jpg

Concrete solution has been poured on the 2nd layer of the wall

1.7.jpg

Waiting for concrete solution in the mold to get dry

1.8.0.jpg

2nd layer on concrete solution 

1.8.1.jpg

2nd layer on concrete solution  (other side)

1.9.jpg

Preparing the 3rd layer of the concrete wall

1.10.jpg

Support for the mold has been check and verify by the worker

1.11.jpg

Preparing the reformed bar for the concrete wall

1.12.jpg

Preparing the reformed bar for the concrete wall

1.13.jpg

Preparing the reformed bar for the concrete wall (other side)

1.14.jpg

Worker preparing support for the mold of the concrete wall

1.15.jpg

Pouring of concrete solution on the 3rd layer of concrete wall